Location: Kiel, Germany Contract duration: 1 year (2016 - 2017)
Challenges
• MEKO A-200 is the latest, most modern version of the MEKO class, which already equips many navies around the world. • Delivery of 2 ships to the Algerian Navy in 48 months, including refitting and updating to new standards.
Solutions
• Turnkey offer: design, purchase, manufacture in our Hamburg workshops, installation and commissioning. • Scope: HVAC (heating, ventilation and air conditioning) systems; CBRN (nuclear, radiological, biological and chemical) protection, chillers; fire-fighting systems.